NEWFOUNDLAND
AND
LABRADOR
REGULATION 109/13
Newfoundland
and Labrador
Hydro-Exploits
Generation Exemption Order
under the
Electrical Power Control Act, 1994
and the
Public Utilities Act
(O.C. 2013- 257)
(Filed September 19, 2013)
Under the authority of section 5.2 of the Electrical Power Control Act, 1994
and section 4.1 of the Public Utilities Act,
the Lieutenant-Governor in Council makes the following Order.
Dated at St. John's
, September 19, 2013.
Julia Mullaley
Clerk of the Executive Council
REGULATIONS
Analysis
Short title
1.
This order may be cited as the Newfoundland and Labrador Hydro-Exploits Generation Exemption Order
.
109/13 s1
Back to Top
Definitions
2.
In this order
(a)
"Nalcor" means the energy corporation established under the Energy Corporation Act
and includes a subsidiary as defined by that Act; and
(b)
"project" means the hydro-electric generating facilities, and their associated transmission and auxiliary facilities, at Grand Falls-Windsor, Bishop's Falls, Star
Lake
and Buchans.
109/13 s2
Back to Top
Exemption
3.
(1) Newfoundland and Labrador Hydro is exempt from the application of the Electrical Power Act, 1994
and the Public Utilities Act
for all aspects of its activities pertaining to the purchase, from Nalcor, of electrical power and energy from the project.
(2)
The activities referred to in subsection (1) include:
(a)
planning and engineering new electrical power and energy generation and supply;
(b)
negotiating and executing all contracts necessary or incidental to any activity described in this exemption; and
(c)
acquiring and paying from its operating account, to be recovered through its rates, all amounts to be paid for the supply of this electrical power and energy under those contracts.
109/13 s3