This is an official version. |
Copyright © 2025: Queens Printer, Important Information
|
|
NEWFOUNDLAND Menihek
Hydroelectric Generation Station Exemption Order
(Filed December 23, 2024) Under the authority of section 5.2 of the Electrical Power Control Act, 1994 and section 4.1 of the Public Utilities Act, the Lieutenant-Governor in Council makes the following Order. Dated at St. John’s, December 23, 2024. Krista Quinlan ORDER Short title
1.
This Order may be cited as the Menihek
Hydroelectric Generation Station Exemption Order. Definition 2. In this Order, "Menihek Hydroelectric generation station" means (a) the hydroelectric generation station and related facilities located at Menihek Lake;
(b)
dams, dykes and other works required for the generation of power at Menihek
Lake;
(c)
transmission facilities necessary to deliver power generated at
Menihek
Lake to a suitable point of interconnection with existing transmission facilities; and
(d)
any other facilities and equipment necessary for the facilities, works or equipment referred to in paragraphs (a) to (c). Exemption
3.
Newfoundland and Labrador Hydro is
exempt from the Electrical Power Control Act, 1994
and the Public Utilities Act
for all aspects of its
activities pertaining to the Menihek
Hydroelectric generation station. Commencement
4.
This Order comes into force on January 1, 2025. ©King's Printer |